Installation of easy to clean, which is cutting jobs to prepare.Is easy to clean? To prepare the pieces outside the production line. And to complete the steel sheet.Before joining in the production line for 2 months
Install entreated the work to prepare the steel is entreated. Preparations are underway for the production and finishing of steel sheet completely before entering the production line in two months.
Install shield which is prepared to cut steel.A shield is preparing for work outside the production line.And the decorative sheet steel, neat.First brought into the production line 2 months.