The history of the creation of the dam Ubolratana Ubolratana dam is hydro dam, the first of its kind built in the Northeast and is the 2nd child from King bhumipol dam a dam created the block filled up at the River, called the "flesh to squeeze" high water Pong district, Tambon khok, King Amphoe Ubolratana. In the past, or Ubolratana in the present District of Khon Kaen province, Khon Kaen province 50 kilometers. operation when the dash board when routing 2502 (1959) consisting of. Cambodia, Laos, Thailand and Viet Nam, where e-Café (important economic Board came in Asia). Is established and received cooperation from the Japan specialists have made a survey, a branch of the Mekong River and the River project is proposed to consider the flesh first, because you benefit the development of the Northeast. The Government of Thailand has negotiated subsequent to the contract, the Bank loan to the Republic of Germany with the promise to reconstruct the uk construction and design. The Act gives power to the Northeast is the construction. When did construction begin 2504 (1961) in late last year and completed 2507 (1964) 2508 (1965) his Majesty is his Royal Majesty thanop RA Royal Paradise tea breaks, invited her daughter, a granddaughter of King? Chao FA Ubolratana dam, '' said Raj kanya "Ubolratana dam" and opened by his Majesty's Royal operated with. H.R.H. King Phra Borommarachininat and Joseph ball, she Chao FA Ubolratana Kingdom kanya to turn tank Ubolratana Dam for electricity on March 14, 1966. Ubolratana dam is a dam constructed to squeeze flesh. Create block district filled up river, Khon Kaen is Ubolratana dam. The first hydro power that EGAT has built up in the North East and is the second of the country from Thailand. Bhumibol dam, the dam is a rock-filled core clay. With a length of 32 m, 885 m high dam located at the San level + 185 meters (great g-sea-level). 6 m wide dam is a dam in San base width of 120 m 2 with a capacity of reservoir, 263 million cubic meters. Building a power plant. Located on the left side the dam installed generator capacity, the total number of 3 kW 8400 engine capacity, kW, all subsequent EGAT has 25200 update Ubolratana dam to improve the performance of the ronthao dam flood, and a strengthening of security provided to the auxiliary dam is a dam by the 185 metre level + Tenderloin (great..) as a level + 188.10 (great.) at the end of the original base of the dam, which is 120 meters wide, extending from a 125 m by the end of the year, but a stool carried and adjusted finished 2527 (1984) year 2530 (1987)
การแปล กรุณารอสักครู่..