Development of Pak Phanang river basin development, Nakhon Si Thammarat. Is a project that meet the development of the king. To solve the problem of shortage of fresh water in the consumer and agriculture.By creating a floodgate (Peter.) water วิภาช qualities can prevent seawater invasion into Pak Phanang River and can retain water 0.30 he added at the maximum It has been established that. Dr.The more the overall drainage of Pak Phanang basin changed from the original, and so the project runs effectively. Therefore, it is necessary to track the changes arising from the development of services.By collecting a database before and after construction of Peter.The water วิภาช performance, coupled with the opinions by questionnaires and interviews stakeholders in the project area
from the study. Found that before the construction.Flood irrigation area วิภาช performance has also been developed not full potential. Unable to resolve the problem of the area, as mentioned above. However, when considering the overall after construction to the present.The use of a water reserve in the dry season. And build confidence with farmers in Pak Phanang River Basin There was fresh water reserves for cultivated in dry season.As well, even though the project To be successful, but still have to track evaluation and improve the development of services. In accordance with the context of the area. The variation of immune system and society as a whole next
.
การแปล กรุณารอสักครู่..