-The steps to install the Base Surge, Aux Alarm Contact. 1. unplug the power supply from the Rectifier cabinets (LLVD) and the DC BOX to prevent harm to the workers and equipment. 2. unplug the cord Input side of Surge Protection and disconnect the Ground strap and Comb Bus-bar as an example. 3. unplug the Base Surge must be changed by using a screwdriver pry the locking device. 4. disconnect the Surge Protection out of the Base to make a Base that has Aux Alarm Contact as an example. 5. a new Base there will be no Alarm Contact Aux. Slot of the SPD (yellow arrow), move to the Slot of the SPD from the old Base into the Base with Aux Alarm Contact.5.1 changing the Slot of the SPD (yellow arrow). Using a wax head, gently pry it up from the small glinus Base Base and insert original new Aux Alarm Contact. 6. prepare the Base Surge that has Contact with Alarm Aux Wiring. Aux Wiring Diagram Alarm Contact along the way. ** Note: the Surge into the Base Assembly should be prepared ready to Plug into the Aux Socket plugged. Alarm Contact.To finish first, and then install the bracket i
การแปล กรุณารอสักครู่..
