This cooperative project is intended to study the documents WORK INSTRUCTION (WI) The work of paving fabric and to improve performance of fabric coverings fabric coverings by adjusting speed. Forward-back-machine cutting speed of paving fabrics to meet the standard, it is time to cut the plate has the best time. Using the method of storing data on education, and interviews from the engineering and production. Human resources development department by selecting samples in the study (fabric stretched Spendex, Patagonia wool) to collect performance data to collect from the actual page. By ask the employee who made the machine control, and data collection from primary 3 (Gen), Timestudy, Kaizen.
การแปล กรุณารอสักครู่..
