Employers must pay damages per period. Resolve all the more from the design by writing a draft, and the extension of the term added to the contractors from section 5, as appropriate, and be agreed by the two sides.
The employer must pay compensation for the period. In addition to editing all the design drawings of the draft. And extending up to the contractor of the fifth, as appropriate and agreed by both parties is completed.
The employer to pay damages to the period. To edit all the more from the design drawings, in addition the drafts. The extension added to and from the contractors 5 as appropriate and agreed to both sides, is completed.