King Bhumibol Adulyadej gave the initiative more in detail that for Check Dam type prevents sand flow into a large tub will need to make a better and deeper, because the sand will slug down considerably. If the shallow sand to jump down a big tub.For moisture protection does not need to dig deep, but just let the water into the soil. But this would spoil the design ต้ทำให้ลึกและ? Do not let the water down and chase the sand out to his Majesty the King's initiative regarding the possible considerations create a dam. Retarding the hydration system water circuit to maximize forestry sanction is to continue to explore the location create a dam upstream on the highest level, near the top of the Hill as much as possible. Characteristics of fai such The new design will be necessary to be able to retain enough water volume for a long time 2 months, keeping the water reservation. From rainy pass to make water supply and prop up saplings bred strong and rapidly use planting in arid forest example. Regularly and continuously by the water supply around the Weir until the stand-up.
การแปล กรุณารอสักครู่..
