Dear Karn & Oom
control work mould. The asset and life of the mold. A part that affect the quality of parts
.This is PPQC will need to keep track of when the mold is moved location maintenance and is active near due Shot Life
.Since the PPQC occurs when the July 2012 also began to explore the status of each Supplier mold at the time Dew are responsible!But, because at that time still doesn't understand and an assortment of Part manpower, including มีงาน about establishing WI come with
New. Model of Honda stopped doing a
.Until now, there have been New Part / New Model that PPQC prepare the production as one. It started to control and track the status of mold again
summary:Deposit does with Kan exploration status and kept contact with mold every month. Frequency adjust (as appropriate)
especially in Model we look 310A FIT include,,,, and 4P00 VF68 RT80 Current Model
of Supplier. We all look 1.Wako
.
การแปล กรุณารอสักครู่..