1.5 The forecast of passengers and goods. Both domestic and foreign, in connection with the case.
1.12 Preliminary design (Preliminary Operation plan) right now and in the future.
1.13 Analysis of economic and monetary
1.14 To propose guidelines to private investors.
1.15 Preparation of the feasibility study of the project. 2.2. Preparation of Administrative and Information Acquisition Project. 2.10 Estimated construction cost of 2.11 Estimated compensation of land and buildings.
การแปล กรุณารอสักครู่..