1.The construction vehicles blocking to prevent water flooding which is a traditional method, but by the time ancient land construction vehicles blocking the water parallel to the right away from the edge of the river banks enoughsuch as water in the spaces between the project and the project มูโนะ Hopeaodorata, by His Majesty King Bhumibol Adulyadej, Narathiwat, etc.
2.The construction of water can be diverted to alter all the water to overflow the Banks or some overwhelming, out by the construction of an morphed into water or digging of the Canal connected to the new River, there is a problem.sink or out to sea in accordance with the appropriate action to respond to the Royal Irrigation Department, perform this procedure to resolve the issue of the river, and, in the damage and flooding fields of several thousand people every year rai
3. The river conditions improved, and furnished to the gushing water flow can be easily along the river to help current or flow of water faster, which is a relieve the damage from flooding. Using the method as follows:
dredge river was shallow, flowing water,
decorated in accordance with land banks, slopes, flat, as obstacles to the path of the water hyacinth and weeds
disposal demolition obstacles to water flow, ruled out
If crooked River bend, a new river canal dredging guidelines for direct flow of water facility construction
dam water retention is one of the important measures that flood in
the water that flows to flood overflow in the rainy season by storing it on the north side of the dam reservoir in accordance with the current, Rajadamri many places in Thailand and to prevent floods in the country.Is
.
- forest River basin development projects initiated by His Majesty King
- Pak Panang basin development project area by his Majesty King Bhumibol Adulyadej
- Nakhon Nayok River basin development project on the Nakhon Nayok
การแปล กรุณารอสักครู่..
![](//thimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)