As in 2550, the Department of Public Works has announced a high-rise building. And building extra large Nationwide have to check the building. To secure access to the building. Building Control Act (No. 3) Act 2543, Section 17, which provides added the following as Section 32 bis of the Building Control Act 2522, Section 12 bis about requiring building owners to. to verify the stability of the structure of buildings and building components such as electrical systems, air conditioning systems, elevators, fire protection. And drainage system, which is currently in effect then. And building owners are required to be completed before December 29, 2550 by a large check every 5 years, and the annual audit every year. Building owners must provide building inspectors to inspect the building, so the building is to be under. The Act came into force, the current nine categories including : 1. building means a building or a person may enter up to a height of 23 meters above the height of the building, measured from the ground level. Building a Deck Building gable or hip roof construction is measured from the ground level to the top. The walls of the top floor 2. Extra large building means a building dates back to the building or any part of the building is residential or operation of one or more categories. The combination of all classes in the same area of 10,000 square meters and 3. Building assembly means a building or part of a building where people can go on for the sake of the assembly of the area since 1000. Square meters more Or gatherings for up to 500 people to theaters 4. 5. Hotel under the hotel has 80 rooms ranging from Room to 6. facility under the facility with an area of 200 square meters or more. 7. Condo Condo Act Or residential buildings with a total area of 2,000 square meters and more ●. If there is an area of the same post no more than 5,000 square meters, check and check results before October 25, 2555 ● If there is an area of the back of the over 5,000 square meters, check and send. results of the review prior to October 25, 2553 8. building under the plant with a height of more than one floor and a floor area of 5,000 square meters to 9. Signs or something built for the signs. The height from the ground from 15 meters or an area ranging from 50 square meters or label or on the roof or roof of a building. Or any part of the building with an area of 25 square meters or more so. Building to provide investigators with a total of 9 categories with the transitional provisions. The owner of the building, whose construction has been completed or received a certificate under section 32 for not less than one intro. A building inspection and setting of the building's first major inspection is completed and reported the results of such monitoring to the local authority within a period of two years from the date of entry into force of this Regulation. Hereto announced mirage Pressure Gazette on December 29, 2548, so the date of December 29, 2550 the owner or occupant of a building must be submitted. Report to the local official
การแปล กรุณารอสักครู่..
