3.5 Qualification Test and System Integration 3.5.1 Qualification Test Test
.The seller must plan the test. How to measure to test the walking machine. To the tobacco factory approval for no less than 60 before testing. By testing machinery and equipment must be tested 4.It covers all systems that the seller is supplied. It must have a test of a system or production line, at least as follows.
การแปล กรุณารอสักครู่..