1. is there a responsible activity and productivity (5, etc.). ISO 9000 systems, energy conservation, or other activities as assigned.2. follow the safety procedure3. the administrator of the NT Server and Level 2 Plant, ABB is to efficiently.4. System Administration to Network effectively.5. maintenance of the Personal Computer, the e-mail system of the Plant, and various peripheral devices to users efficiently.6. the consultation and the analysis of the problem in conjunction with the bosses. To eliminate the problem, and that is effectively.7. make a daily backup.8. report to bosses on a daily basis
การแปล กรุณารอสักครู่..
