- it's raining time 10: 30-12: 00.
- rain time 10: 30-10: 45.
- start work 9: 40.
- TTM open Work 9: 45.
- drilling without drilling machine is broken due to know
opening. Work job raised floor is not ready, documents are not
PTW open after 1pm
.PMC (Controller) to perform religious rites
- start work 9: 00.
- absence due to the TTM. Check face
- still have some work Continue tomorrow
- started working 10: 15.
- afternoon 15: 50. A little rain about 20 minutes
- afternoon 15: 50.A little rain about 20 minutes
.