Therefore, it is necessary to improve the areas as follows:1. blocking some roads to the construction site to make travel a little bit narrower but also can be passed. 2. follow the road project to demolish all units so that the truck can access materials. Konnifon fall, use a canvas roofed walkway.
การแปล กรุณารอสักครู่..