The purpose of the project.In order to reduce the burden of drainage through the Chao Phraya River during the winter and water into the sea due to sea water, bolster the amount of water to flow out, not by the sea, cooled water through space toward the West side of the river via the Canal into lower towards the khlongomhachai – pine.And then, machai River to the sea side Samut sakhon by a gate blocking the drainage canal and Canal khlongomhachai – Sanam Chai calls with the pumping station as required, which is the capacity of the Canal in the area of the swamp Nong, will act as the "monkey cheeks" collect, receive and retrieve from flooding the area on the way out to the sea and the mouth of Khlong khlongomhachai Rama. The Canal and the Canal South to examine heart warlords. by virtue of the force of gravity. By pumping up the rhythm of the sea –
การแปล กรุณารอสักครู่..
