The process of shedding contaminated powder and packing process. The problem is that it takes a long time to produce, and that it caused bottlenecks. Is there waiting. Use Work study, work Study, ECRS by finding the standard work time and reduces the working procedure is not necessary. To reduce the time it takes to produce the round and makes 34.62% volume increase from the original order is 95% of the money that has come back to 1.45 million per month.
การแปล กรุณารอสักครู่..