In order to solve traffic problems within the municipality of San kamphaeng district. National economic and social development board (board) and the Bureau of the budget, the project plan in the area 8 provinces in the upper northern region. The 128 project limit, include 387 389.45 million in the cabinet meeting outside at Chiang Mai on 15 January 2555 low cabinet approved the construction project bypass early Bao. The separate hostel. 121 confluence hostel.1014 late pond - DOI saket, San kamphaeng District, in Chiang Mai, budget for the reclamation and construction 100 million. The spokesman is the responsible authority. The construction of bypass (By-pass) city the Bao.It also reduces the energy consumption. As a link network and travel with
.
.