Study on the whole process of 4 adhesive spray processes invade the cruise sprung hinges, pegs and assembling, found that the risk level 1 risk slightly (1-2) and two levels of risk acceptable risk (3-6) did not have a high level of risk that requires action to reduce risk. Compared with the regulations, the Department of industrial works. Directive on the criteria of hazard indicator indicators of risk assessment and risk management plan, b.e. 2543.
การแปล กรุณารอสักครู่..
