project objectives :
1. to allow farmers to take advantage of the irrigated area fully
2. To enhance the learning
3. To associate all sectors participating
beneficiaries. :
People little village, home moon, marshes and nearby villages in the district for Tao Ngoi. Sakon
details of the project
and the building structure
- a dam blocking the creek strike (Kam River Basin)
- Coordinates 5842 IV 48 QVD 120-720 liable or three hundred twelve thousand one hundred E UTM N the 1,872,200th
- began construction in 2526 and completed. year 2530
- a wide, 6.00 meters high dam at 395 meters, 26.00 meters
- 49.00 sq km area of rain
- the amount of water flowing into the basin's annual average of 74 million cubic meters
- the latter +209.50 soil bunds. m. - the Thok.
- maximum water level +209.20 m. - the Thok.
- the water catchment +207.50 m. - the Thok.
- low water level +192.50 m. - the Thok.
- High water volume of 24.00 million. cubic meters
- the volume of water stored 21.00 million cubic meters
- the minimum volume of 1.285 million cubic meters of water
- the surface area of 1.800 square kilometers of catchment
- shaped outlet type U (reinforced concrete. ) measuring 550.50 meters long, 33.00 meters.