The design, the company has concern measures to prevent the flood. The design and construction of the building above the flood level years 2554 10 CM. And for the pipeline of the gas.It project manager coordinate with the relevant departments to safety in construction, which แนวท่, PTT is located near the pike area. Km 0 900 to km 8 550 which project away from the pipeline construction has more than 5 meters.
การแปล กรุณารอสักครู่..