5.1-8 map of potential areas of expansion in industrial development. From risks 5-10 In the occurrence of floods. 5.2.2-1 frequency analysis of maximum water level, including stations at prachin buri River in Kabin (kgt.13) 5-22. 5.2.2-2 an analysis of maximum water level, frequency, period, station building houses the prachin buri River (kgt.22) 5-22.5.2.2-3 model cars flood protection the khandin 5-24.5.2.2-4 model cars flood protection the water barrier 5-25.5.2.3-1 standard of drainage system
การแปล กรุณารอสักครู่..