Repair during the fault warranty period If the contractor fails to manage the repair, repair, repair, weighing system, slow truck WIM and information system within the specified time, the contractor agrees that the contractor will make repairs at the rate of 10,000 Pa per day until the date when the contractor completes the repair work.
การแปล กรุณารอสักครู่..
