Because ASP is now active at M building Chiller and building the thai Capital recently changed to a new building in 2013, 2 500 Tons each by smaller buildings, is a principal in the current usage of 2 per day and a book 470 tons Carrier brand size 1 x, which more than 15 years, working as a backup when a parent needs to stop maintenance or irregularities, which it only 75-80% efficiency, which, if required, over time they will find jobs, higher electricity costs and reduced cooling performance. Therefore, for consistency in the air conditioning system in the building need to be replaced with a new machine by 2 the total given in the specifications, VSD controlled to conserve energy during the Load or load reduced building Pass in each moment, so polished, so your ASP project change to offer the following chiller.