Answer the question, the 1
references from the contract clause 3.9.3 (b) Tow aircraft between other agreed points (on a request and recharge basis.
Attachment. 1-Ad Hoc GSE and Labour Charges
Pushback Tractor per push THB 5 000
, but in this case is
Towing aircraft from Bay 14-79 and Bay 79-14 (number two times) per Tow, THB 5 500: Total charge, THB 11 000
.Answer the question, the 2
due to drag the plane to BAE 79 requested equipment list is 2
1. Passenger Step
2. Ground Power Unit
please check device from documents per file attached.