The landing at the pier is the technology to manage because each competing to seem as minutes to lift items up and down. The current management system, the port called Port Automation serves to manage the port on the system that use the Computer and the robot in front of port containers transportation. The process is as follows:Stacking Lanes are arranged 1) move the items to the pile, which is putting a layer called a Stack, which are usually arranged by the 4-5 container is the width of the channel is called a Gantry Crane is a tool in which the current cross in multiple Computer System Right port into the Location given by the Chamber Control Room cabinets, are used to control the.2.) to move the container to the port which can be used to page a Gantry Crane or forklift may rely on the so-called Top acts on the move.Slot 3), a Stacking containers that are placed in front of the pier, Quay or more placed on the Quay Crane is a Crane ship, with the next act in the port.Thailand is the main Pier is the port of Bangkok, which has almost 1 million access cabinets per year, and the port of Laem Chabang, there is. Cabinet and out of approximately 2.9 million TEU-3.0 also has the map Ta phut Pier, Pier, Satun, Songkhla, deep water port which Thailand itself would require countries compete with many countries, whether in Hong Kong or Singapore, which has access. Each year approximately 17.04 million TEU
การแปล กรุณารอสักครู่..