When projects are developed, infrastructure such as water treatment systems without wastewater treatment system project will be located under the road surrounding the project, which is 6 meters to the South section North to the site of the pond water, flame retardant. Room for waste The project is also designed to address ground floor East building.
การแปล กรุณารอสักครู่..