For this shipment shipper wants to change the size of the Cabinet is a space of 1x40 dc we will check you in Mol, tomorrow. But for the Shipment, because we have sent a booking of maersk, Shipper, and shipper already plan to loading on 05/01/2016. If you want to change. Boat wiring may cause a sliding load you want confirmations, shipper will allow us to check with mol before?
การแปล กรุณารอสักครู่..
