As I Known, all action was to avoid glue residue on the material.Inline IPQC will inspect each batch and confirm whether it is normal.So, proposal maintain the current strategy until the material before action is shipped that about Ww28(7/B). And the check the 3 fresh lot status then resume monthly monitor.รับจ้างทำงานทั่วไป
การแปล กรุณารอสักครู่..
