The attached file is a table, design conditions and mine ponds, mining costs in 2010-2016, which I check calibration and geophysical maps are prepared for the times that I have data in the 2014-2016.
Attached is a table conditions pit design and cost of mining at the years 2010-2016, which I am currently preparing revised maps and geologic information to operate as they have in years 2014-2016.
The file attachment is a table design condition pit mines and cost mining years 2010-2016 which I"m checking and adjustment of preparing geological map to assemble as any information in 2014-2016.