Beam but rush Prabha building block river canal light at chiewlarn district he luckily, ban Fang District, Surat Thani Province, is a rock-fill dam core clay. High 94 meters long dam 761 meters. The dam block and 5 Hellfire pass again.5.638.8 million cubic meters, reservoir area 185 square kilometers. Water flow into the basin, the annual average 2 598 million cubic meters, installed the generator. The 80,000 kilowatts of 3 machine
.เขื่อนรัชประภา is a multipurpose dam Use both, irrigation and electricity generation, building block river canal light at home chiewlarn district he luckily, ban Fang District. Surat Thani Province, formerly called.Construction started on 9 February 2525 was completed in September 2530 when building completed receive divine grace from the king. The royal new field. "เขื่อนรัชประภา" means "The king welcomed Sirindhorn, Royal เขื่อนรัชประภา permanent open and hydroelectric power On Wednesday, September 30 2530
.