1. The number is printed on the barrel IBC
- when the last time. Saroj ask you to order the production numbers, however
- chassis number 1-100 to 1-100 number printed on the cylinder respectively
- chassis number 101-110, type the number 101 Rework - 110 Rework Example 2. ATEX ZONE • In the previous meeting. Saroj inform you that it will consult with the parties and to report back within IBC tank • When filling the tank should be Zone 21 to the sprays of Material which is likely due to an explosion in a mixture of milk fat. And there must be a system Grounding. • Environmental Zone 22 must be outside, so the equipment outside. Means the device must be exposed to the environment Zone 22 Therefore, every cabinet, light box, it will be dust in Zone 22 and IP 65 • Air Wash Station is likely to be dust in material distribution. Because they use air pressure to clean the Air wash station should be in Zone 20 • no device in Safe Area • Discharge Station outside of Discharge station to Zone 22 and in the Zone 21 • For MATCON held. Do Risk Assessment sent to you by Nestle 'with 3. Delivery • from ever talking to the purchasing of companies Hellenes catchy. Purchasing a concern in their delivery. Because that should have been some of the first after Leighton Nest deposit MATCON so plan to work in a kind of isolation shipped to each slot. Divided into two parts: the delivery of goods 1. Item 1-3 and 5 (see documentation System Proposal Matcon Ref: 144394 Rev C) - will be transported by sea from England and Ireland in the coming weeks. or 10 weeks with Monday, February 29, 2559, according to Table 1 and to allow time for another one week to process customs so goods will be transported to. Pacific Intertech in Week 11 or Week is Monday, March 7, 2559 2. Product Item 4 cylinder IBC - will be transported by sea from the Czech Republic Charlotte 16 per barrel, by a significant amount. The route is 64 leaves means that the plant can resume production when a tank factory least • Fully 64 pieces of tanks being transported by sea from the Czech Republic and came to the United States reached 64 or 10 weeks. or a week on Monday, February 29, 2559 (along with its Item 1-3 and 5) in the table attached at one time and will be available for one week so the customs clearance of goods will be transported to. Pacific Intertech in Week 11 or Week is Monday, March 7, 2559, as well as remarks by the plan was the first to arrive on January 25, 2559 • Fully 110 tickets (46 tickets remaining) by the bucket. will be transported by sea from the Czech Republic and came to the United States reached 110 leaves in week 13 or week of Monday, March 21, 2559 and will need extra time to process through customs again one week so items will be transported. to Pacific Intertech in Week 14 or Week is Monday, March 28, 2559 concluded that. All goods will be transported to the Pacific Intertech everything in week 14 or week of Monday, March 28, 2559 and installed in a month. In April the company Nestle would have to transport less time as possible. Previously, there has been talk of the Nestlé procurement. Have some cargo in the country after the first payment. Transportation is proceeding as scheduled is IBC tank will be transported to Los Angeles more than 16 the number seven Los Angeles and another one Charlotte Marine Pacific to gather and talk about the MATCON and. shipping companies to reduce the amount of time in transit, and to talk with the company Nestle on when the equipment arrived in the Pacific Intertek, the company will check the monitor includes a FAT takes about two weeks. To ensure that the device can operate. Then, the company will be able to install. The company Nestle has the Pacific states. Can be installed for a period of two weeks, meaning that Pacific time you install and start up 10 days in 2559 and again four days left Nestle to clean. Keep bacteria and micro wait To ease the process of checking the quality. Nestlé introduced and emphasized that should outdo deburring and cleaning the oil spill cleanup and removal of moisture IBC tank to complete the restart of the installation could begin operations in early April. Maybe a 3-16 April 2559 by the times may have changed. And will have a meeting to talk to each other after the date of installation. The scope of work days in the period 3-16 April 2559, will include the demolition of existing machinery and equipment, leaving about two days with the Pacific Intertech that period may not be enough. Due to the relocation of IBC tank, it takes a long time to unload the tank. Nestlé therefore advise transport tanks from the Pacific. The plant, Nestlé Nava estimated at 29 or March 30, 2559 when tanks were being transported to the Nestlé factory in Nava Nakorn before scheduled installation date. The factory must provide sufficient space for IBC tank to approximately 20m x 10m in the clear, it can not be concluded. We need a meeting to discuss detailed steps again in February, the Pacific Plan will work with Nestlé. When all the equipment from the vehicles, must be stored in the factory prepared. When introduced into plant has to be cleaned up and brought into the factory area. Or take it to another area that is free from infection and then introduced into the plant. The cleaning will need to avoid using water. Because water can cause infection in three. Approval Mechanical Discharge Station is not used Load cell below the discharge station is connected to a sieve tray in previous meetings Pacific has stated that it will have to be adapted to cover the requests from sieve tray oval. Into a circular shape To connect to BFM by the Nestle company will submit a drawing and a picture of a sieve tray with the Pacific states. In addition, it must be adapted to the MATCON increase the length of the exit of the discharge station numbers 2,3,4,5 (per core) to be installed as well.
การแปล กรุณารอสักครู่..
