And during execution. It is necessary to cross behind the okboriwen building (B14), because the material is very large, and the weight, which cannot be transported through Bandar subdirectory, or lift it
And during operation It is necessary to exit at the back of the building (B14) since the material is heavy and large equipment can not be transported via stairs or lift.
And during the operation. There is a need to move out at the back of the building (B14). Because the material is very large, which cannot bring the weight and stairway or elevator