It is because there are already tyres measuring station entrance station to send Yang came to 1, and then start the measuring procedure. Make up the rim down to be rubber.11. to change the program while waiting for the Centre to perform troubleshooting, contact SAP, but an error in the communication.Centering close -> Lifter down -> Upper rim down -> lower chuck close -> upper chuck open -> inflate -> centering openNow changed PLC program back to original condition because if inflate while centering arm close it will be effect to mechanical Part of centering unit, may tire explosion, bead sit position not OK. The current sequence as belowCentering close -> Lifter down -> Upper rim down -> lower chuck close -> upper chuck open -> centering open -> inflate This problem occurs a second time. It is not an error to solve the station box. PL cafter remove upper rim from lower spindle of 46C-0580 and check condition found it still available.Operation manual mode by check found no workable parts which can damage can run production.
การแปล กรุณารอสักครู่..