How to deal with loss, in addition to the Bill of materials. "Lost outside the Bill of materials." In addition, it refers to the fraction of raw materials in the manufacturing process, the mean too raw material requirements that do not correspond to the objective quality of the raw material has not been damaged during the production of debris remaining from the production of raw materials as well as finished products and the finished quality. The section also lost the recipe. In addition, the company will ask the BOI-authorized checks for evidence of the coming cuts (reconciled) and can also cut other ways. accounts with. Is as follows: 1. the request for export to foreign countries 1.1 must apply for permission before sending out to foreign loss. 1.2 case loss is not in the form of raw material imports and failed to check the outbound cargo volume. The company will need to be assigned from the BOI, check prior to export. 1.3 when send best lost abroad, apply to BOI approval setoff against loss. 1.4 when it has been approved to apply that investor Club Association (IC) to adjust the amount of raw materials, the following.
การแปล กรุณารอสักครู่..