I love translating Abstract
Company V. S. S. Product Co., Ltd. was founded in 2544 with registered capital of five million baht on an area of 2 rai 1 ngan 23 square wah plant employs about 40 people, the company's paint products. Working with department stores such as Big C, Lotus Seven Eleven store, etc. These were assigned to the company. A piece goods On the shelf, such as floor plans, the back, the latch on the bracket below, clotheslines, poles, carts and comic WIRE DUMP the organizer and corporate executives have agreed that there should be education. Cost data sheets shelves, which has the most productive of all. In order to determine the profits earned. And store it in the days ahead I will have to cut costs or improve processes. This project aims to study the cost of putting an end to the trade floor. The study and collect data to determine the cost of production. To calculate profits During the production of shelf parts stores newly produced compared to the production end, up from the plate rack old products to use, then come to Recycle so that it can be used again
so prepared, so storage costs. At each step of the production process of the production process is the production of two-layer disc with making up a whole new layer of active Recycle been damaged to compare the compensation to be received. Results from the storage shelves in plate production. The production of a new model. Sheets and shelves Recycle your old was taken to see that there are pros and cons of different treatments. Advantages for sheet shelves newly manufactured, it is the production process less navigation pad shelf worn to the Recycle disadvantage is a higher cost navigation pad shelves different sources Recycle. Let the good old sheet shelves, the production costs are lower. But there is a downside A manufacturing process of several steps over
the study period used in the production of shelf-old using the Time study worksheet found in the manufacturing process takes approximately 6 hours cost paint remover paint one pond, 120 tanks first. Tank 35 Kg price per kg 16.50 baht, so the liquid first pit = 120 x 35 x 16.5 = 69,300 baht liquid paint one pond can expect about 30 surrounding liquid paint first round of the paint pad shelves Parallel 0.55 x 1.2 x. 16.5 m to 45 sheets so liquid color wells using paint pads Shelf has = 45 x 30 = 1,350 sheets, so the cost of paint / 1 sheet = 69,300 / 1,350 = 51.34 Baht cost color using paint 1 Kg throws around. 5 m² shelves if the sheet size is 0.55 x1.2 x 1 m = 0.55 x 1.2 = 0.66 m² area painted two sides will think is an area
= 0.66 x 2 = 1.32 m², so the paint spray booth is approximately 1.32 to 1 Kg. / 5 = 3.79 color plates cost 115 baht for 1 Kg, so the cost of spraying 0.55 x 1.2 x 1 1 sheet = 115 / 3.79 = 30.35 Baht The cost of using. Plate racks obsolescence = cost + Cost colors used spray paint = 51.34 + 30.35 = 81.69 Baht >>> = 82
studies, time spent in the production of sheet shelves using the Time study Worksheet found. Process takes about 4 hours, 53 minutes, cost new steel one-piece steel costs
= (x weight steel selling price) / number of parts produced at current market prices of steel around 35-50 baht per kilo than get by. Steel Dimensions 0.55 x 1.2 x 1 m, weighs about 5.13 and steel prices are per kilogram to 43 baht, so the size 0.55 x 1.2 x 1 m 1 sheet Price = 221 Baht costs applied paint spray 1 Kg throws about 5 m² you. Sheet shelves measuring 0.55 x 1.2 x 1 m will have an area = 0.55 x 1.2 = 0.66 m² paint two sides will think is an area = 0.66 x 2 = 1.32 m² so 1 Kg to spray approximately 1.32 / 5 = 3.79 plate. Cost Color 1 Kg for 115 baht, so the cost of spraying 0.55 x 1.2 x 1 1 sheet = 115 / 3.79 = 30.35 Baht The cost of using a new product shelves = steel costs + Cost colors using spray = 221 ÷. 30.35 = 251.35 = 252 baht, but because the steel market has fluctuated always so. The costing sheet of old shelves and shelves must be charged for 5-10% of the iron from the above data is calculated by comparing the cost of production of sheet and plate racks, shelves of old products. This is a rough calculation of production costs. But the costs are different, obviously. In addition to the costs mentioned above. Production costs are also other costs do not vary much as labor, equipment and miscellaneous. Gas, electricity, water Value Pack of all the data you can see that in the production of shelf-old will take to produce more than about 1 hour, 7 minutes and costs of production, rack end, older than the plate. new product shelves up to 170 baht / piece.