Start the test for surface layer 1 and Layer 2 and layer 3 and layer 4 of the main building, the new building, the wadaira sea gate (on detail hours according to the table above.)
Start testing for ground floor, first floor and second floor and the third floor and 4 of the main building, building new Seagate drive ( as detailed at the table above ).
Start a usability test for ground floor 1 and the 2 and floor floor floor of the main building of the 3 4 and building new drive Seagate (according to the details on time according to the above table .