3. follow this step with every piece.4. an inspection of the exterior, according to manual VI-WI-PRD-000 and then save all the results into a form VI-FO-OPE-000.5. pour pouring device with load nasai sampling 2 pieces per cycle, based on the user's manual VI-WI-PRD-000, and then save the result into VI-FO-OPE-000 form.6. written form products that are not certified, every piece of equipment with VI-FO-NCP-001 does not pass the quality criteria.7. the eligible products and then to keep it on the floor.
การแปล กรุณารอสักครู่..