By designing a special highway access control-barrier fence wall design through the intersection with the highway construction is split and crossing the footbridge and began construction in. 2537 (1994) is a special layer standards, size 4, traffic channel (min.2.) Each side 2 with the surface traffic, concrete construction, Semitic safan was completed around the year 2540 (1997)
การแปล กรุณารอสักครู่..
