20. costs not associated with construction, or can not be allocated to the construction site must be integrated into the cost of the construction cost includes.
20.1. administrative costs which the repayment of principal are not listed. Contract
20.2. costs to sell
20.3. costs of research and development, which recalls paid by the employer is not specified in the contract.
20.4. depreciation of plant and equipment is not in use, which is not used. Construction of such
การแปล กรุณารอสักครู่..