The AHU AHU, 11-9, 10-6, to Cabinet and to book a domain in MDB, exhaust fan, fresh food, which is included in the circuit breaker electric with SDB to 60 kW or 17% of all the electricity requirements of the building.
Pay AHU 01-09, paid AHU 10-18, payable to reserve the room cabinet for MDB and paid to the exhaust fan fresh food. SDB breakers are included in the power demand of 60 kW, representing 17% of the electricity needs of the building.
Pay AHU 01-09, pay to AHU 10-18, pay for safety main reserve in MDB and pay centrifugal fresh, which is in the circuit breaker. The demand for electricity SDB was 60 kW or about 17% value of electricity demand all of the building.