November 15 2554 (2011) piya tantayaporn University Sao Paulo raya Vice President post company Thailand co. Ltd. revealed that flood problems result in the post office was flooded, all 38 from 1,200 regular post is approximately 1.5 million pieces of residue. From the normal circulating daily mail 5 million pieces. Make the letter amounts to an average of 1 in 3 of the residual amount of work that must be paid, but the company is still open to work as usual. The post does not have access to paid staff will open the mail-bag sorting according to the letter to the zone, and then sort by the page address and, when the water level is to send mail, postman to the recipients immediately [237]Don Muang airport, where the plane of the air force and aviation maintenance, that Thailand is having trouble moving because the airlines have more damage from flood-comment ka airport [238]
การแปล กรุณารอสักครู่..
