After testing a sample at the same time, the document will be sent to the monitor in the same time interval. Appointments to inspect the factory. Expected to be performed during the last week of August.
After the test sample through. At the same time, the document will be sent to check in the same period. the appointment to check the factory. Expected to be complete in the last week of August.