Report output to a table. Control of waste. Report a problem Report a machine malfunction caused by raw materials with follow-up after editing and song offer, the next shift.
The real yield on production schedules. Control of the problem causing the malfunction of machinery, raw material and follow up after the fix. And delivered the next shift.
Report output actually with production schedule control of waste problem report, report the cause disorder of the machines, the raw materials with follow-up after correction And the curious given the task to the next