13. place the Master gauge down in Housing starts from a position that is contrary to 1 the drain hose. Then measure the position further. The clockwise by the value at 17.2 ± 0.3
13. laid down in the Master gauge Housing starts measure from the one that is contrary to the pipes drain. Then measure the position further. Clockwise The value has to be at 17.2 ± 0.3.
13. Put Master gauge into Housing started the measured from the position 1 is opposite drain pipe. Then the measuring position. A clockwise by the values must be at the 17.2 edge 0.3.