The main task of land management include follow his. Allocated plots of land to farmers divided into residential and 787
plots, 7 608 Rai, permission to build a house, ask out the house number, the
.The correction and inspection rights land tenure. Supply the irrigation system and water utilization, the station pumping station 2 station 1 number 3 machine station 2 number 2 machine. Irrigation pipe system, 40 length.A pipe system, asbestos, S., bass, asbestos, size, 1210 8 6, and finger, the finger members
4 and reservoir in the responsibility of the 4 basin irrigation is the bass Valley Reservoir.
400 000 capacity, cum Sai - Bass Valley reservoir capacity, 800 000 m3 Creek Reservoir Capacity,
320 glass.000 m3 Creek Reservoir Capacity, water shortage 15 000 cum demonstration and experiment of Agriculture published public relations work in cooperative projects and cooperative extension program. The current members 445 People
with capital operation, 750.17 baht, 24 164
.
การแปล กรุณารอสักครู่..
