Soft sand, rocks, soil, weathered drilling by Rotary Rig or Hammer Grab when digging through Temporary Casing pipe end must be entered Bentonlte into the hole to prevent the wall hole punch waste (Necking), then drilling down to the floor by using a special punch head. By the depth in the rock layer, make sure that the solid rock not less than 3.00 m.
การแปล กรุณารอสักครู่..
