The main activity in the construction and installation phase that is expected to affect surface water quality and aquatic ecology: preparation area. To adjust the level region and production base construction area, hole filling. To improve the existing road to gain access to the base floor holes. Transport equipment, transport, waste and solid waste management, hazardous waste, and machine maintenance/filming engine oil and natural water sources project of drainage near the base area, the hole in 2 km radius:
การแปล กรุณารอสักครู่..
