-Study and detailed design of 3.67 million grant limit. -Grant railway and is 3.47 million baht grant limit. -Construction of railways limit 197 million baht (empty, 30 per cent and 70 per cent lending) against the railway platform at thanaleng train station. At present, there are trains to serve stations between Nong Khai and thanaleng train station 2 trips per day, there are construction projects in Laos sapop. rail extension from thanaleng train station. Distance 9 km, which Thai Government agreed in principle to provide assistance with construction. However, Laos has sought to slow down the project before because the size is smaller than the standard Rails railway rails of high-speed railway project, which will be based on the Chinese border, Metropolitan. Vientiane, may consider changes to create a railway bridge across the river for the high speed railway to connect its high speed rail Thai instead.
การแปล กรุณารอสักครู่..
