Plan Development Economic Corridor East - West (East-West Economic Corridor)
have created a path Kun Mang - Gong Lu (Route R3E)
3) development roadmap Economic Corridor South (Southern Economic Corridor)
3.1 route Trat - Koh Kong. send - Rae Am the year, as part of the coastal Thailand - Cambodia - Vietnam (R10) 151.5 km and is 288 million baht for the construction of large bridges 4
3.2 route Chong Sa Ngam - a long time. send - Siem Reap improving road distance of 167 km, which is the link between
the East and the South of Thailand, Siem Reap. The conditions of the loan agreement to resume talks mid-2547.
การแปล กรุณารอสักครู่..
